<< Back

This job listing is no longer active.
Please use our Environment Jobs Search to find current vacancies.

Title

Wind Engineer, Brazil

Posted
Reference   (Please mention Stopdodo/Environment Jobs in your application)
Sectors
Location Brazil (Central) - America South
Salary Range Dependent on Experience
Type Fixed Term and Permanent Roles
Status Full Time
Level Mid Level
Deadline 10/10/2008
Company Name Pacific Hydro
Contact Name
Website Further Details / Applications
Pacific Hydro logo
Also Listing:
Description
The purpose of the role is to manage and coordinate the technical evaluation and analysis of wind farm developments in Brazil.  This includes:
  •  management of wind monitoring equipment, evaluation of new wind energy regions; preliminary assessment and design of new wind farm sites;
  • conducting due diligence on development and operational sites that Pacific Hydro Brasil (PHB) is considering purchasing;
  • providing technical support for planning, development, connection and construction work.

This role will focus on installation and operation of wind monitoring masts and identification of wind farm sites of existing and new projects in Brasil with a view of assisting with the evaluation of such projects against Company risk profiles.


2. KEY ACTIVITIES AND RESULT AREAS


MET MAST OPERATION

  • Update meteorological stations' wind databases
  • Manage the installation, maintenance and dismantling of wind monitoring towers through subcontractors. 
  • Recommend and oversee equipment installation complying with international best practice guidelines (eg IEA). 
  • Ensure high data quality.

SITE IDENTIFICATION & WIND FARM LAYOUT DESIGN

  • Participate in the analysis of new site selection in Brazil.
  • Undertake area analyses (desktop) and related site visits
  • Prepare preliminary wind assessment reports on new geographical areas/sites for wind energy developments including use of the World Wind Atlas etc.
  • Evaluate and select prospective mast locations for wind monitoring.
  • Prepare preliminary wind farm layouts.
  • Participate in the analysis of new site selection in Brazil.
  • Participate in due diligence carried out on wind farm sites PHB considers purchasing from other companies.
  • With the support of Executive Manager, Wind Services make recommendations for site rejections
    CONSTRUCTION PROJECTS.
  • Manage micro-siting, including coordination of input from planning, connection, construction and contract management staff.
  • Liaise with Construction Team on wind farm construction wind farm design requirements.

GENERAL

  • Provide technical support to the management team as required

3. JUDGEMENTS
 

  • Requires a  willingness to accept autonomy and responsibility with clear thinking and problem solving in regard to wind farm site assessment
  • Successfully operate in an environment where there are tight timeframes
  • Adhere to and consider Operational Health and Safety standards.
  • Other decisions in respect of:
    - masts location
    - layout
    - analysis and design of the wind farm
    - energy output


4. COMMUNICATIONS

Internal

  • Global Wind Services Team, Melbourne
  • Pacific Hydro’s Finance, Commercial, Executive and Administration teams
  • Pacific Hydro Melbourne & Chile offices

External

  • Generator manufacturers
  • External consultants

5.KNOWLEDGE, EXPERIENCE (INCLUDING QUALIFICATIONS) AND SKILLS

Knowledge and Experience

  • Equivalent Tertiary Engineering Qualifications – eg Energy, Aeronautical Engineering, Meteorology
    3-5 years experience in wind power industry
  • Proven knowledge of relevant software packages, such as WindPRO, AutoCAD, Excel, WAsP, , Windrose and GIS-related applications.
  • Sound wind farm identification and resource evaluation experience
  • Environmental knowledge

Skills

  • Relationship development
  • High level evaluation and analysis skills
  • Strong verbal and written communication skills
  • Problem solving and resolution
  • Fluent English and (conversational) Portuguese

6. COMPETENCY

  • Applying Expertise and Technology
  • Analysing
  • Learning and Researching
  • Entrepreneurial and Commercial Thinking
  • Writing and Reporting
  • Presenting and Communicating Information


7. CHALLENGES

  • To have the ability to manage an increasing workload as the demands on the role increases due to company growth.
  • To remain up to date with the latest methodologies and technologies used in the wind analysis process.


8. DIMENSIONS


This is a high impact position as results are decisive for the financial analysis of the prospective wind farms in Brazil.

Add to My Account
<< Back