Development Phase
Provide technical leadership and oversight of electrical engineering design work by third party engineering firms.
Project management including layout of detailed project plans, monitoring. progress and reporting to management of design and engineering review.
Ensure drawings and designs conform to First Wind standards and criteria.
Work with designated utility to finalize scope of work for interconnection requirements and agreements.
Assist in specifying and procuring electrical equipment for wind energy facilities.
Tour prospective wind farm sites to evaluate potential construction challenges.
Construction Phase
Provide project management assistance for substation, transmission line, and collection system construction.
Coordinate plant SCADA system specifications, project design and installation.
Operate as resource for power system and FERC requirements for field and construction project management personnel.
Perform field audits of construction projects as required to ensure design plans and standards are upheld.
Operations Phase
Provide power systems technical support for operations department
Advise on controls, SCADA, facility metering, FERC requirements and wind turbine performance issues.
Provide root cause analysis of power systems related issues as requested.
Visit operating wind farms as required.
|